Demolition of plant just off Whyte Avenue
Predominantly water and sewer installations, as well as tunneling sewer shafts for University of Alberta, pedestrian tunnels under Jasper Avenue, and excavation for Edmonton Centre foundations
Demolition of United Cigar Store and Western Surplus buildings on Jasper Avenue
Demolition of former Transportation Building on the Alberta Legislature grounds
Demolition of original brick 10-storey building
Demolition and removal of 10-storey building on Jasper Avenue
2,000,000 sq. ft. of building, 8 acres of concrete pads and road, 30,000 m³ of contaminated soils
Demolition of the 1906, 8-storey, 2,000,000 sq. ft. landmark hospital, adjacent to new hospital build
1936 building, including 1.1 million bricks, 600,000 board feet of lumber, 220,000 sections of tile, 14,000 tons of concrete, 22,000 feet of pipe and 50 miles of electrical wire in 12 miles of conduit, and included preservation of historical landmark Smoke Stack
Demolition of 6,500 seat facility, home field for the AAA Edmonton Trappers of the Pacific Coast League
45-foot-high sulfuric acid converter (completed in 14 days in operational plant)
Removal of 25 10,000 Barrel oil tanks in Whitehorse, Yukon
Demolition of grain elevators located in Cereal, Consort, Hobbema, Oyen, Sibbald, Skiff, Taber, and Vauxhall
Demolition of 20,000 seat facility, former home of Edmonton Eskimos
Demolition of one wing to accommodate Lois Hole Hospital for Women, included 60,000 sq. ft. of asbestos contaminated rubble
Demolition of 200,000 sq. ft. and 45-foot tall mine in Dawson City, Yukon
Bridge removal of Fox Drive overpass on Whitemud Freeway
30 acres of corrals and buildings
Concrete LRT station removals along Jasper Avenue
Demolition of former Central Post Office as part of Royal Alberta Museum development
Phased demolition of sections of school to accommodate new construction schedule
Demolition of 6 buildings at former Red Deer Civic Yards (187,000 ft²)
Hazardous material abatement, demolition, and landscaping of former Fort Saskatchewan Hospital
Hazardous material abatement and demolition of 4 buildings on former Griesbach Base
Crushed 15,273 Tons of concrete aggregate to 63mm
Demolition of warehouse and removal of contaminated soil
Demolished 15 bridges (many with 24-hour highway or 6-8-hour rail closures) and 100+ houses and farm structures to accommodate construction of ring road
Hazardous material abatement and demolition of former Greyhound station (2016) and Staples (2014) as part of ICE District development
Removal of 17 flood-damaged houses along Elbow River in Calgary and site remediation
Demolition of former staff housing in Elk Island National Park. Basements were backfilled with aggregate to ensure safety of bison
Demolition and hazardous abatement of Osman Auction, Union Tractor, and City Maintenance building in preparation for new LRT route
Hazardous material abatement and demolition of 317 houses and 458 other flood-damaged structures at the former Hidden Valley Golf Resort on the Siksika Nation near Cluny, AB
Demolition and hazardous abatement of 36 residential properties
Demolition and hazardous abatement of former radar tower in secure area of 4Wing Cold Lake
Hazardous material abatement, partial demolition of compressor station and backfill site
Deconstruction of bridge in Jasper National Park. Girders were sawcut and craned to our trucks for transportation to our recycling yard. Bridge abutments were jackhammered with vibration monitoring to ensure safety of Transmountain Pipeline
Abatement and demolition of junior high school in Edmonton
Abatement and demolition of elementary school. Topsoil and sod
Demolition of a 100-foot-tall concrete water tower, tower base and boiler building. The water tower was safely demolished using a high-reach pulverizer employing a concentric demolition technique
Excavation and disposal of contaminated soil on former Highway Maintenance site
Demolition and site restoration of QEWWTP in the Edmonton river valley
Repair flood damage to paths and riverbank; armour slopes against future erosion
Removal of brine and ammonia; abatement and demolition of former curling rink, banquet hall, and golf pro-shop
Abatement and demolition of the 55,000 ft² two story hospital in residential area
Abatement and demolition of former Husky fuel station, including underground storage tanks
Deconstruction of two water towers, using crane to lift dismantled structure
Demolish arena and outdoor rink
Demolition and removal of elementary school in Edmonton
Demolition and removal of elementary school. Topsoil and sod
Engineered deconstruction of an interior 75-foot-high concrete dust tower and east retaining wall. Using multiple cranes and lifts, the tower was horizontally sawcut into numerous sections and safely removed
Abatement and demolition/removal of 36 buildings within Jasper National Park.
Abatement and demolition of two apartment buildings. Cap water and sewer lines
Abatement and demolition of former RCMP building in downtown Red Deer; shoring was needed to support the adjacent parking garage during removal of basement structure
Demolition and hazardous abatement of building and underground tanks
Demolition of several buildings in two phases at TransAlta’s Sundance power generation facility
Abatement and demolition of 11 commercial and residential buildings and infrastructure in preparation for LRT West
Demolition of casino across the road from Rogers Place
LRT station demolished in overnight shifts aligned with nightly LRT shutdowns to prevent passenger and train disruption
Removal of two former fuels stations, with underground and above ground storage tanks
Interior removal of high metal racking in former AGLC liquor distribution warehouse
Demolition of a remote security camp removing all buildings and contaminated soil; included complete site restoration in a Provincial Park
Abatement and demolition of nine properties downtown and along Stony Plain Road for LRT West construction
Abatement and demolition of six buildings, steel tower and underground infrastructure, including monitoring wells
Abatement and demolition of a large brick building in downtown Edmonton
Abatement and demolition of former gas station including removal of underground tanks and soil remediation completed over two summers as two projects
Removal of a former fuel station with large underground storage tanks
Demolition of a two-storey reinforced concrete building adjacent to a college and daycare in downtown Edmonton
Removal of bridge deck and girders, abutments and slopes over Sturgeon River completed in two phases while Hwy 825 remained open
Abatement and removal of five storey concrete parkade
Abatement and demolition of large high school in St. Albert
Abatement and demolition of former Edson hospital and two community healthcare buildings
Abatement and removal of two storey concrete horse barns at former Edmonton Horse Track
Removal and disposal of 30,593 tonnes of hydrocarbon impacted soil along with overburden; excavation was backfilled and compacted
Abatement and demolition of two buildings and removal of infrastructure on site of 4 Wing Cold Lake
Selective demolition of one wing of university to make room for new building.
Abatement, demolition and clearing of thirty various sites with two larger contaminated soil remediations stretching 44 kms along HWY 3
Abatement, demolition, hardscape removal, utility infrastructure removal and site restoration of 28 structures (including water tower) on 47 acre site in Red Deer
Demolition of 12 structure housing complex with 70 individual units. Completed in 8 weeks