Heidelberg Concrete Plant

Industrial
Heidelberg Materials
Leduc, AB

Highway 3 Twinning: Taber to Burdett

Transportation
Alberta Transportation and Economic Corridors
Burdett, AB

Edson Hospital

Institutional
Alberta Health Services
Edson, AB

Northlands Exhibition Horse Barns

Municipal
Lorac Construction City of Edmonton
Edmonton, AB

Michener Centre North

Institutional
Alberta Infrastructure
Red Deer, AB

Michener Centre North Soil Remediation

Site Remediation
Alberta Infrastructure
Red Deer, AB

Blatchford Parkade

Transportation
Chandos Construction City of Edmonton
Edmonton, AB

Valley Line West LRT - Phases 2 and 3 Building Demolition

Transportation
City of Edmonton
Edmonton, AB

Sommerville Demolition – Town of Stony Plain

Municipal
Town of Stony Plain
Stony Plain, AB

Red Deer RCMP Building

Institutional
Alberta Infrastructure
Red Deer, AB

High River/MD of Foothills – Floodway Relocation Program

Disaster Clean-Up
Alberta Infrastructure
High River, AB

Calgary Cross Bow Building (Calgary Care Centre)

Institutional
Alberta Infrastructure
Calgary, AB

Meadow Creek Bridge, Jasper National Park

Transportation
PCL Construction
Jasper, AB

Hidden Valley Golf Resort Clean-up and Site Reclamation

Disaster Clean-Up
Alberta Infrastructure
Siksika Nation, AB

Northeast Anthony Henday Drive (NEAHD) Expansion

Transportation
Flatiron-Dragados-Aecon- Lafarge, Joint Venture
Edmonton, AB

Floodway Relocation Program

Disaster Clean-Up
Alberta Infrastructure
Calgary, AB

Gainers Meat Processing Plant

1988
Historical

Demolition of plant just off Whyte Avenue

Various

1979
Historical

Predominantly water and sewer installations, as well as tunneling sewer shafts for University of Alberta, pedestrian tunnels under Jasper Avenue, and excavation for Edmonton Centre foundations

98 Street & Jasper Avenue Buildings

1980
Historical

Demolition of United Cigar Store and Western Surplus buildings on Jasper Avenue

Alberta Transportation Building

1984
Historical

Demolition of former Transportation Building on the Alberta Legislature grounds

Burns Meat Processing Plant

1988
Historical

Demolition of original brick 10-storey building

Royal Trust Tower

1991
Historical

Demolition and removal of 10-storey building on Jasper Avenue

Ipsco Pipe Factory

1993
Historical

2,000,000 sq. ft. of building, 8 acres of concrete pads and road, 30,000 m³ of contaminated soils

University of Alberta Hospital

1992
Historical

Demolition of the 1906, 8-storey, 2,000,000 sq. ft. landmark hospital, adjacent to new hospital build

Canada Packers Meat Processing Plant

1995
Historical

1936 building, including 1.1 million bricks, 600,000 board feet of lumber, 220,000 sections of tile, 14,000 tons of concrete, 22,000 feet of pipe and 50 miles of electrical wire in 12 miles of conduit, and included preservation of historical landmark Smoke Stack

John Ducey Baseball Park

1995
Historical

Demolition of 6,500 seat facility, home field for the AAA Edmonton Trappers of the Pacific Coast League

Agrium

1997
Historical

45-foot-high sulfuric acid converter (completed in 14 days in operational plant)

Whitehorse Tank Farm

1996
Historical

Removal of 25 10,000 Barrel oil tanks in Whitehorse, Yukon

9 Alberta Grain Elevators

2002
Historical

Demolition of grain elevators located in Cereal, Consort, Hobbema, Oyen, Sibbald, Skiff, Taber, and Vauxhall

Clarke Stadium

2000
Historical

Demolition of 20,000 seat facility, former home of Edmonton Eskimos

Royal Alexandra Hospital

2002
Historical

Demolition of one wing to accommodate Lois Hole Hospital for Women, included 60,000 sq. ft. of asbestos contaminated rubble

Asbestos Mine Building

2004
Historical

Demolition of 200,000 sq. ft. and 45-foot tall mine in Dawson City, Yukon

Fox Drive Overpass

2008
Historical

Bridge removal of Fox Drive overpass on Whitemud Freeway

Edmonton Stock Yards

2005
Historical

30 acres of corrals and buildings

Central LRT Station Rehabilitation

2012
Historical

Concrete LRT station removals along Jasper Avenue

Royal Alberta Museum

2013
Historical

Demolition of former Central Post Office as part of Royal Alberta Museum development

Victoria School of Performing and Visual Arts

2009
Historical

Phased demolition of sections of school to accommodate new construction schedule

Red Deer Civics Yards

2014
Historical

Demolition of 6 buildings at former Red Deer Civic Yards (187,000 ft²)

Fort Saskatchewan Hospital

2015
Historical

Hazardous material abatement, demolition, and landscaping of former Fort Saskatchewan Hospital

Griesbach H18, H19, H20 & C1

2015
Historical

Hazardous material abatement and demolition of 4 buildings on former Griesbach Base

Leduc County Crushing

2015
Historical

Crushed 15,273 Tons of concrete aggregate to 63mm

Yellowhead Trail Warehouse

2016
Historical

Demolition of warehouse and removal of contaminated soil

NE Anthony Henday Drive

2017
Historical

Demolished 15 bridges (many with 24-hour highway or 6-8-hour rail closures) and 100+ houses and farm structures to accommodate construction of ring road

Rogers Place

2016
Historical

Hazardous material abatement and demolition of former Greyhound station (2016) and Staples (2014) as part of ICE District development

Calgary Floodway Relocation Program

2016
Historical

Removal of 17 flood-damaged houses along Elbow River in Calgary and site remediation

Elk Island Housing Demolition

2016
Historical

Demolition of former staff housing in Elk Island National Park. Basements were backfilled with aggregate to ensure safety of bison

Valley Line LRT

2017
Historical

Demolition and hazardous abatement of Osman Auction, Union Tractor, and City Maintenance building in preparation for new LRT route

Hidden Valley Golf Resort Clean-Up

2017
Historical

Hazardous material abatement and demolition of 317 houses and 458 other flood-damaged structures at the former Hidden Valley Golf Resort on the Siksika Nation near Cluny, AB

High River Floodway Relocation Program

2018
Historical

Demolition and hazardous abatement of 36 residential properties

Cold Lake TRACS/Radar Tower Demolition ASR Tower -B163

2017
Historical

Demolition and hazardous abatement of former radar tower in secure area of 4Wing Cold Lake

TCPL Princess Compressor Station - Brooks

2017
Historical

Hazardous material abatement, partial demolition of compressor station and backfill site

Meadow Creek Bridge

2018
Historical

Deconstruction of bridge in Jasper National Park. Girders were sawcut and craned to our trucks for transportation to our recycling yard. Bridge abutments were jackhammered with vibration monitoring to ensure safety of Transmountain Pipeline

Wellington School

2018
Historical

Abatement and demolition of junior high school in Edmonton

Edson Evergreen School

2018
Historical

Abatement and demolition of elementary school. Topsoil and sod

Westlock Water Tower

2018
Historical

Demolition of a 100-foot-tall concrete water tower, tower base and boiler building. The water tower was safely demolished using a high-reach pulverizer employing a concentric demolition technique

Ross Creek Contaminated Soil

2018
Historical

Excavation and disposal of contaminated soil on former Highway Maintenance site

Queen Elizabeth Waste Water Treatment Plant

2019
Historical

Demolition and site restoration of QEWWTP in the Edmonton river valley

Whitemud Creek Pedestrian Bridge

2019
Historical

Repair flood damage to paths and riverbank; armour slopes against future erosion

Edson & District Recreation Complex

2019
Historical

Removal of brine and ammonia; abatement and demolition of former curling rink, banquet hall, and golf pro-shop

Calgary Complex Continuing Care Facility

2019
Historical

Abatement and demolition of the 55,000 ft² two story hospital in residential area

Fox Creek Husky

2019
Historical

Abatement and demolition of former Husky fuel station, including underground storage tanks

Evansburg & Wildwood Water Towers

2019
Historical

Deconstruction of two water towers, using crane to lift dismantled structure

Peace River Recreation Centre

2019
Historical

Demolish arena and outdoor rink

Millcreek School

2019
Historical

Demolition and removal of elementary school in Edmonton

Old Ardrossan Elementary School

2019
Historical

Demolition and removal of elementary school. Topsoil and sod

R2437 and R2499 Selective Demolition

2019
Historical

Engineered deconstruction of an interior 75-foot-high concrete dust tower and east retaining wall. Using multiple cranes and lifts, the tower was horizontally sawcut into numerous sections and safely removed

Whistlers Campground, Jasper

2019
Historical

Abatement and demolition/removal of 36 buildings within Jasper National Park.

Lendrum Manor & Villa

2019
Historical

Abatement and demolition of two apartment buildings. Cap water and sewer lines

Red Deer Justice Centre

2019
Historical

Abatement and demolition of former RCMP building in downtown Red Deer; shoring was needed to support the adjacent parking garage during removal of basement structure

Peace River Reservoir

2020
Historical

Demolition and hazardous abatement of building and underground tanks

TransAlta

2020
Historical

Demolition of several buildings in two phases at TransAlta’s Sundance power generation facility

Valley Line West Phase 2

2021
Historical

Abatement and demolition of 11 commercial and residential buildings and infrastructure in preparation for LRT West

Baccarat Casino

2020
Historical

Demolition of casino across the road from Rogers Place

Stadium LRT

2020
Historical

LRT station demolished in overnight shifts aligned with nightly LRT shutdowns to prevent passenger and train disruption

Flying J Stations – Drayton Valley & Edmonton

2020
Historical

Removal of two former fuels stations, with underground and above ground storage tanks

AGLC High Rack Removal

2021
Historical

Interior removal of high metal racking in former AGLC liquor distribution warehouse

Kananaskis Minimum Security Camp

2021
Historical

Demolition of a remote security camp removing all buildings and contaminated soil; included complete site restoration in a Provincial Park

Valley Line West Phase 3

2020
Historical

Abatement and demolition of nine properties downtown and along Stony Plain Road for LRT West construction

Meanook Research Station

2021
Historical

Abatement and demolition of six buildings, steel tower and underground infrastructure, including monitoring wells

ATCO North

2021
Historical

Abatement and demolition of a large brick building in downtown Edmonton

Little Smoky Gas Station

2022
Historical

Abatement and demolition of former gas station including removal of underground tanks and soil remediation completed over two summers as two projects

Flying J Station Fort MacMurray

2021
Historical

Removal of a former fuel station with large underground storage tanks

Norquest College

2021
Historical

Demolition of a two-storey reinforced concrete building adjacent to a college and daycare in downtown Edmonton

Hwy 825 Bridge

2023
Historical

Removal of bridge deck and girders, abutments and slopes over Sturgeon River completed in two phases while Hwy 825 remained open

Blatchford Parkade

2023
Historical

Abatement and removal of five storey concrete parkade

Paul Kane High School

2023
Historical

Abatement and demolition of large high school in St. Albert

Edson Healthcare Centre

2024
Historical

Abatement and demolition of former Edson hospital and two community healthcare buildings

Northlands Exhibition Barns

2023
Historical

Abatement and removal of two storey concrete horse barns at former Edmonton Horse Track

Michener Centre North Soil Remediation

2023
Historical

Removal and disposal of 30,593 tonnes of hydrocarbon impacted soil along with overburden; excavation was backfilled and compacted

4 Wing Demolition B63 and B636

2024
Historical

Abatement and demolition of two buildings and removal of infrastructure on site of 4 Wing Cold Lake

King’s University

2025
Historical

Selective demolition of one wing of university to make room for new building.

Highway 3 Twinning: Taber to Burdett

2024
Historical

Abatement, demolition and clearing of thirty various sites with two larger contaminated soil remediations stretching 44 kms along HWY 3

Michener Centre North

2024
Historical

Abatement, demolition, hardscape removal, utility infrastructure removal and site restoration of 28 structures (including water tower) on 47 acre site in Red Deer

Petrolia Park

2024
Historical

Demolition of 12 structure housing complex with 70 individual units. Completed in 8 weeks