Heidelberg Concrete Plant

Heidelberg decommissioned the former Inland Cement concrete plant in Leduc, AB. Visco was contracted to demolish the batch plant, conveyor system, adjoining office complex, concrete lined washout pit, an in-ground steel hopper, and concrete box located at the base of the conveyor system. Four material silos were also part of the scope of work, which included dismantling, cutting, and falling them prior to removing them from site.

The structure was pre-cut to ensure that it would fall in the correct location. A boom lift was employed to provide safe upper access to structures. The tin was stripped off the batch plant to expose the steel beams, allowing a top-down demolition. All concrete was recycled.

Visco achieved a 97% diversion rate from landfill for Heidelberg.

No items found.
Client:
Heidelberg Materials
Contract Value:
$100,000
Structure Type:
Commercial
Project Role:
Demolition Contractor
Project Schedule:
Oct 2024 to Dec 2024
Project Manager:
Tony Gruhn
Disposal Quantity:
Site Supervisor:
Address:
5903 44A Street, Leduc, AB
Project Area:
Project Type:
Demolition services on the highway